how to calculate the steel for rcc slab?
plz tell me the formula for calculating the steel?
Answer Posted / k.srinivasa rao
for calculating the area of steel in rcc slabs,
ast = ( M ) / (.87*fy*(d-.42*xu))
where
M= moment corresponding to entire loads of span in one
meter length
fy= characteristic strength of steel
d= depth of slab
xu=lever arm depth depending upon the type of fy given
in Is:456-2000
| Is This Answer Correct ? | 216 Yes | 72 No |
Post New Answer View All Answers
How to calculate the crank rod in slab
in staad ,why we realease a moment of a member ? what is affect if we realease a moment
Floor to floor high of domestic building is 3m design a quarter turn staircase starting assume taken give a suitable diagram of it?
how much percent are used 20mm,10mm?
what is diffrence between catchment area,watershed and basin?
1.How much batten required for 1 sqm Shuttering. 2.how much pipe & clamps required for staging of 100 sqm shuttering at 5.0 m height.
how to design and calculate materail quantity for concrete speedbreaker ?
Can any body help me out by telling hoe swelling pressure test of soil is carried out ? some body told me the procedure & formula (change in length /116.3*100%) but still i am confused ? pls help.
What are the responsibilities of a construction manager?
how to create our resume?
My daily concrete volume of M25 concrete is 1st day= 25 Cum 2nd Day = 45 Cum 3rd Day = 55 Cum 4th Day = 22 Cum 5th Day =72 Cum 7th Day = 49 Cum. What will be acceptance criteria of concrete considering as per is 456 cl.15 and table 11 (cl 16.1 and 16.3).
Spider cracks occur in beam bottom due to––
how we calculate the grade of the Bituminous materials.?????
What is the use of mirror command?
What are the basic use of runners and standards of pipelines?