Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

what will happen two jobs have same name are submitted

Answer Posted / santy

Buddy,

samul says is right.
we can submit many jobs at a time with smae name, b'cos
system will generate unique job number for each job.

Is This Answer Correct ?    16 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

When it is desirable to describe files Internally?

1648


We have job which is running as batch. It takes atleast 06 hours to complete tht job. But I wanna do tht job with in 3 hours?

1201


What is the difference between iter and do?

1152


what is the necessary keyword needed to scroll subfile records?

1103


Assume 2 users are using the same file and first user updates some record in the file. Will the 2nd user will be able to see the updated record or not?

889


What is the purpose of record level identifier?

1080


Q:Hi all,i want accurate answer with code using in built functions.please sent me code as soon as posible. I have program nmed PGM1 which '' RETRIEVE Current production date''should correctly default the production date for the user who is issuing raw materials to the manufacturing.The production date can be different from the celendra date. However, the program does not make the correct adjustment for all manufacturing plants. there is a parameter which determines the production start time e.g. 07:00 if the system time precedes this,the program subtracts one from the celendra day.This work fine when the celendar day starts after production day as it does in England,the system should be adding one to the celendar day during the overlap. unfortunately the program was desined to assumed the celendar day always starts before the production day. Change required in the program: Change the PROGRAM PGM1 to use the new parrameter to decide whether to add or subtract 1 from the celendar day when determining the production date.

2201


How can we know running job is batch or interactive?

1049


what is data area and how it is used in rpg program ?

1266


what do you mean by an input subfile, what are the keywords required?

1198


What is file identifier where we can use?

1077


How to handle duplicate error handling in RPG?

2228


Explain mdt?

1069


How do u design a physical file, when you have 2 Unique fields like for eg in A student file student ID and student examination no both are unique

957


How to select highest score of each subject or how to select highest income of every month?

1709