Actually DG size has to select depends on maximum demand
and considering base load and starting load and step load
base load = total maximum demand - loads which are
taking high loads at startign
starting load = if motor loads are DOL starts 6 times to
the Ifl will take at starting and soft
starters /VFD's will take 3 times to Ifl
step load = Whwn the main power supply is off
immidiently what are the load we can
switched ON through DG -called step load
(generally 40-60% of Dg load can be ON as
first step)
So our selected DG shopuld meet the step load and capable
to withstand startign loads
| Is This Answer Correct ? | 12 Yes | 5 No |
Post New Answer View All Answers
What are the applications of autotransformers?
we are having 110 Kv,250mA Electrostatic precipitators for coal fired boilers. what will be static voltage and current after discharge and what time it will remain before earthing?
How I can Compare 120v/60Hz versus 220v/50Hz ? Please tell me both advantage and disadvantage ......
Why temperature rise is conducted in bus bars and isolators?
what is the difference b/w UHVDC and HVDC(LIGHT)?
why we used dc supply for field in dg set
send me all basic electrical question and answers
Why to keep capacitor bank off while generator running.
i need mat lab program to find out the transmission line losses,regulation and losses
How to use earthing on shipments.
does buccholz in a transformer use batteries
When is lag lead compensator is required?
How stabilizer works??
What is difference between Over Current & Earth Fault protection?
how to put cable sizing and cable glands size for respective cable & Cable Lug size in a DB sectors???