What is Copy Control? and how it works in sales documents ?.
Answer Posted / manoj kumar guin
WE can use copy control to define the requirements and
options when transfering the data from reference document
to its subsequent document .Copy controle in the other
words we can say as copy the data from source document to
target document .
FOR sales document-copy control options are sales document
to sales document and copy controle -billing document to
sales document .
THe copy control rules set up to enable a sales document
type to be copied into another sales document type such as
quotation to sales order and sales order to sales order .
Is This Answer Correct ? | 14 Yes | 5 No |
Post New Answer View All Answers
What is the relevance of 'Weight/Volume Relevant' tab in Credit Memo Request and Debit Memo request as in both, it is checked at item level? As I know, it is being used to re- determine route at delivery level.
What is the difference between connected & unconnected lookup?
what is condition types? What is the path to define condition type in sap for pricing?
how to fill the GAPs in BBP?give me one example thanks in advance venkatesh
Where in the sale order would you enter the serial numbers for material?
How we can do invoice split depending on item category in which scenario we will use?
what is eligibilty concept for discounts?
Define to which organizational element is central in shipping?
What is ‘consignment stock processes'?
What are the primary functions of sales and distribution?
How have you used MASS tool in your last project, and to upgrade what data?
What does the account group of the customer control?
how you can include condition type in the pricing procedure?
What is erp and sap?and why inplementing sap in an organization? Explain the special features of sap over other
I have a scenario where the our unit of measure is Pc. The conversion is 1pc = 2.9768 m2. Now the client is saying that he will give the prices in Cubic meter. The current requiment is we have to derive a conversion ratio between pc (m2) and cbm. Please advice.