WHICH INSTRUMENT USED TO CALIBRATE CONTROL VALVE?
Answer Posted / v.suresh kumar instrumentation
The calibrate the control valve used for mA Source
Meter .mA Souce apply for I/P Converter so Opening Closed
for Control Valve .At the opening closed time measured for
position note.Supposed opening for Valve positioner 50% ma
13.5 So adjust the Zero or Span Calibration to Control the
ositioner
Chart
% Actual Value Error Zero/Span
0 4.7mA 0.7 4mA
25 8.5mA 0.5 8mA
50 12.0mA 0.0 12mA
75 16.4mA 0.4 16mA
100 20.5mA 0.5 20mA
| Is This Answer Correct ? | 81 Yes | 8 No |
Post New Answer View All Answers
all types of liquid analyzer principle with drawing?
How an rtd work, and what volts/current goes to a rtd to measure the resistance?
A PLC is programmed to drive three motors A, B and C as follows : After running motor A for an hour, motor B should get ON and motor A should get OFF. And after running motor B for an hour, motor C should get ON and motor B should get OFF. And after running motor C for an hour, motor A should get ON and motor C should get OFF. (That is, a cyclic repetition with time period one hour) Now, the second condition is: If any motor gone faulty and is tripped, the consecutive motor should get ON and the faulty (tripped) motor should be eliminated from cyclic repetition. The remaining two motors should bear the cyclic repetition of one hour each. (For healthy motor take logic as high and for tripped motor take logic as low) Now, the third condition is: When motor A load(Amps) exceeds 60% of its rated load, motor B should get ON in parallel to motor A. And when both motors A & B are running in parallel, and if their load exceeds 60% of their rated load, motor C should also start in parallel to A & B. [Here the cyclic repetition is eliminated, until their loads become normal(40%)] [Take logic high(1) for load at 60% and logic low(0) for load at 40%] Now draw a flow chart or a ladder diagram to fulfill the above condition.
defination of radial vibration?
field bus transmitter calibration procedure tell me
What is Cavitation in a control valve?
steps for installing orifice plate?
where i can get training in INTOOLS and PDMS in Delhi-NCR OR north part of India. please reply with ur ans. at arunsamkaria@ymail.com
what are the steps I have to deal with?
In Safe Guarding test what means by "Failed to Danger" ?
Yokogawa CENTUMVP R6.09 unable to download to Engineering Station with ExaOPC R3.75
The issue is when I try to download the common project section to the Engineering Station (STN) from the HIS in System View, it is unable to connect. The error displayed is:
WARNING: Could not connect to equalize destination. (7001)
Retrying. Number of retries = 0/1
ERROR: LdXopsLoadMain: connect error 10060
ERROR: Processing terminated due to connection error. (7002)
Equalization end with errors. STN0149
---- ERROR = 2 WARNING = 1 ----
Background:
>Updated the ExaOPC software on the STN from 3.60 to 3.75
>STN operating system is Windows Server 2008 R2
>HIS operating system is Windows Server 2016 Stanard
Solutions attempted include:
>Ensuring all IP addresses are correct and all networked devices can be pinged.
>The ability to ping a device using its host name from another device (
how to measure oxygen which methods are using?
Somebody tell me in what way i need to prepare for csio pgrpe(adv instrum eng)interview?what all the quest can i expect?
what deference between panel earth and systemearth
What materials are used in thermo wells?