my scenario is repetitive manufacturing (REM) make-to-stock
(MTS)production for sugar industry. What are the things, I
have to customize for this scenario, to the PP point of
view..
Answer Posted / manuel
This is a very large question, but I tried to resume it:
We supose you have the rest of Master data created (Work
Center, Bill of Material, Routing ) , so I will only
explain the differences;
1.- Material Master: You have to create Product Versions
(C221), add this information with MM02 to materials.
Also you have to Fill View MRP4.
2.- It's neccesary a Cost collector.
This a very
| Is This Answer Correct ? | 9 Yes | 4 No |
Post New Answer View All Answers
What is Backflush, the places where the backflush is used?
If u maintain sub-contacting where and how will be reflect
Explain the lsmw and the steps involved in them.
What is scheduling
What is the use of mrp group?
Why the work scheduling view is required for semi-finished and finished products?
Suppose the client wants me the vacancy to be displayed on a website as well as ess. How should I do it?
any one can provide me some sample resume for SAP PP with 0 to 1 year experience?
What is SOP and types of SOP?
What are the MRP master data?
what is group bom? Is it possible to attach the drawing for a material to bom? How?
One component we can assign to workcenter at routing
What does the use of ms70 followed by mcec get you?
What is sla (service level agreements)?
How you get the ticket?