What will be the value of STRING after line 0106 is
executed in the code below?

0101 E* Fromfiletofile..tabnameprnentlenpdatabnamlenpda
0102 E ARR 8 1
0103 ISTRING DS
0104 I 1 8 ARR
0105 C MOVE *BLANK STRING
0106 C MOVEA'ABC' ARR

A) 'AAAAAAAA'
B) 'BBBBBBBB'
C) 'CCCCCCCC'
D) 'ABC '
E) ' ABC'

Answer Posted / samul paul

Answer would be :-

ARR(1) = 'A'
ARR(2) = 'B'
ARR(3) = 'C'
ARR(4) = ' '
ARR(5) = ' '
ARR(6) = ' '
ARR(7) = ' '
ARR(8) = ' '

Is This Answer Correct ?    3 Yes 1 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

How Chain operation copies the record's data to the input buffer for the program?

1064


How to define data area in RPG program? In which scenario multi occurrence DS is use in AS400?

1550


Explain mdt?

651


How do u design a physical file, when you have 2 Unique fields like for eg in A student file student ID and student examination no both are unique

539


can any one help in hawkeye and turnover or any change management system plzzzzz or send the documents to my mail id :gvsp.as4@gmail.com

1950






1. What is bound-by-call and bound-by-reference? 2. Where and why is *Nomain used? 3. What are the difficulties faced by programmers when using service programs? 4. Explain the different ways of parsing and compiling XML in iSeries.

5375


How can we override a file during runtime in rpg?

673


what is *place and *auto keyword in prtf ?plz explain

2706


How to declare the pull button in AS/400..

1864


Q:Hi all,i want accurate answer with code using in built functions.please sent me code as soon as posible. I have program nmed PGM1 which '' RETRIEVE Current production date''should correctly default the production date for the user who is issuing raw materials to the manufacturing.The production date can be different from the celendra date. However, the program does not make the correct adjustment for all manufacturing plants. there is a parameter which determines the production start time e.g. 07:00 if the system time precedes this,the program subtracts one from the celendra day.This work fine when the celendar day starts after production day as it does in England,the system should be adding one to the celendar day during the overlap. unfortunately the program was desined to assumed the celendar day always starts before the production day. Change required in the program: Change the PROGRAM PGM1 to use the new parrameter to decide whether to add or subtract 1 from the celendar day when determining the production date.

1747


What is a record lock error?

1250


How to handle duplicate error handling in RPG?

1660


What is the difference between iter and do?

657


how do I preserve and clean the array?

658


We have job which is running as batch. It takes atleast 06 hours to complete tht job. But I wanna do tht job with in 3 hours?

749