how to write test cases if we have, given requirement and
teplate.
Answer Posted / accenture
We can directly write test cases in Test Plan and later
move them to Test lab for execution or else we can create
test cases in Excel sheet or Word and then upload them to
the Quality center to the Test Plan
Basically we need to create scripts in Excel or Word the
following details
1. Path in Test Plan where the test cases need to be placed
2. Manual status
3. Designer name
4. Test case Details
5. Script Name
6. Step Number
7. Script Description
8. Expected Result
Is This Answer Correct ? | 13 Yes | 1 No |
Post New Answer View All Answers
How can we export multiple test cases from td in a single go?
What is quality center( test director)?
How can we create our own defect template from test director? Is it possible in test director?
Explain the project tree in test director?
Hi All, Im currently getting to grips with the Document Generator in Test Director and have a query. We use TD to link requirements to test cases and I am attempting to produce a report which lists the requirement and the test case it is linked to. I cant see a way to do this as the test case link info resides on the Coverage page and it appears the only field available to display for requirements reports within document generator as those on the 'details' tab. Any tips?
Explain the procedure of connecting testdirector in qtp?
How you integrated your automated scripts with testdirector?
How can you run automated test cases td (quality center 9.0) ?
Can we export the files from test director to excel sheet? If yes then how?
How to customize the reports generated?
Can you retrieve a test case once you have deleted them in test director?
What is the difference between master test plan and test plan?
What databases can test director reside on?
How to map testcases with requirements in test lab?
What r the views in testdirector?