WHAT HAPPENS WHEN SQUARE PULSE IS GIVEN TO THE INPUT OF THE
TRANSFORMER
Answer Posted / sanket patil
IN SOME CASES THE TRANSFORMER IS DESIGNED TO APPLY DC
PULSE( NOT CONTINUOUS DC SIGNAL ) TO ITS PRIMARY WINDING
AND THE TRANSFORMER IS CALLED AS "PULSE TRANSFORMER".
IF DC VOLTAGE IS GIVEN TO WDG; AS WDS IS AS GOOD AS
INDUCTOR HENCE CURRENT I=(1/L)*INTEGRAL(Vdc)dt, WHICH WILL
CONTINUOUSLY INCREASE THE CURRENT FLOWING THROUGH THE
WINDING. HENCE THE WIDTH OF THE PULSE SHOULD BE SMALL
OTHERWISE THE TRANSFORMER WINDING WILL BURN.
IN THE PULSE TRANSFORMERS THE RESISTANCE OF THE WINDING
SHOULD BE KEPT MINIMUM TO LINIT THE I^2*R LOSSES AND LIMIT
THE TEMP OF THE WINDING BEFORE INSULATION FAILURE.
| Is This Answer Correct ? | 7 Yes | 2 No |
Post New Answer View All Answers
Cost of an item is Rs 12.60 ,profit is 10% over selling price.
if the word 'ddosszm' is changed to 'central' then what will be the change for 'rtjbl' ?
Body anatomy and physiology and pathalogy condition
WHO WAS GIVEN BEST ACTOR AWAR 2010 IN FILM FARE?
An equilateral triangle of sides 3 inch each is given. How many equilateral triangles of side 1 inch can be formed from it?
a man covered 28 steps in 30 seconds but he decided to move fast and covered 34 steps in 18 seconds. how many steps are there on the escalator when stationary.
In 80 coins one coin is counterfeit what is minimum number of weighings to find out counterfeit coin
In the given quadratic equation, mx2+nx+o=0 .If the ratio of the sum of the roots and the product of roots is 2:7, what can be possible values of b and c?
A can do a piece of work in 20 days, which B can do in 12 days. In 9 days B does ¾ of the work. How many days will A take to finish the remaining work?
The average of x and y is 6.5. if z=4,what is the average of x,y,z.
Four persons can cross a bridge in 3, 7, 13, 17 minutes. Only two can cross at a time. Find the minimum time taken by the four to cross the bridge.
What is the smallest number by which 4880 must be divided in order to make it into a perfect square ?
A dealer sells 3 sets at Rs.2400 each ,one at 20% gain and the other at 20% loss. what is the overall gain or loss.
In a box there are four different coloured bells,of some quantity (4 each ) what is the minimum number of pick ups so that, atleast 2 of them of the same colour.
A finish the work in 10 days. B is 60% efficient than A. So hoW days does B take to finish the work?