Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

a student got 70% in one subject,80% in other.to get overall
75% how much he should get in third subject

Answer Posted / kiran.raikar

75%

Is This Answer Correct ?    11 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

X < 0, Y <> 0 then what is the possibility that the result is always positive?

1497


Rohan bought some rice at Rs. 10 per kilogram. He buys 2 kg rice from a ration store at the rate of Rs. 8 per kilogram. He mixes the two type of rice and sells at Rs. 11 per kilogram. He makes 25% profit. What is the ratio of non-ration to ration rice?

1244


If there are 1024*1280 pixels on a screen and each pixel can have around 16 million colors Find the memory required for this?

1404


Three pipes, A, B, & C are attached to a tank. A & B can fill it in 20 & 30 minutes respectively while C can empty it in 15 minutes. If A, B & C are kept open successively for 1 minute each, how soon will the tank be filled?

1154


In a soap company a soap is manufactured with 11 parts. For making one soap you will get 1 part as scrap. At the end of the day u have 251 such scraps. From that how many soaps can be manufactured?

1292


How many mashes are there in 1 square meter of wire gauge if each mesh is 8mm long and 5mm wide ?

1227


Write a C Program to declare an array for 2 0 floats. Accept the values from the user sort the two arrays in descending order. Merge the two arrays into a new array and display the new array.

2406


One of the longest sides of the triangle is 20 m. The other side is 10 m. Area of the triangle is 80 m2. What is the another side of the triangle?

1214


hi i am going to write SBI Technical Executives entrance exam.pls help me out in clearing thisexam.kindly proivde me the question papers..

2076


A finishes the work in 10 days & B in 8 days individually. If A works for only 6 days then how many days should B work to complete A's work?

1242


The ratio of the number of boys and girls in a college is 3:2. Out of these 10 percent are boys and 25 percent are girls are scholarship holders. Find the no of boys and girls who are not scholarship holders.

1347


A clock is late by 1 minute 27 seconds in a month. Then how much will it be late in 1 day?

1702


Bird is flying 120km/hr b/w b to r. Two trains at b to r at 60 kmph the distance traveled by the bird before it is killed.

1160


sir plz send the rrb exam question papers my emailid is abhilasha.bollepalli@gmail.com

2770


Robert invested rupees 8000 in a fixed deposit scheme for 2 years at compound interest of 5 p.c per annum. Calculate and choose from the below mentioned option, how much amount will Robert get from the fixed deposit on maturity?

1139