Answer Posted / nilkanth.
There are mainly three types of sub-stations.
1.step up/down substations-where stepping up or stepping
down of voltage has done.
2.power factor improvement sub station-where power factor
is improved by installing capacitor banks or synchronous
condensors.
3.switching sub stations- Where switching action like
switching on or off has done for maintenance purposes for
other reasons.
4.poll mounted substation, Underground substation
Is This Answer Correct ? | 31 Yes | 4 No |
Post New Answer View All Answers
What will be electrical cost per sqft for IT building (basebuild and fitout)and for residential township?
Why does an induction generator is preffered as compared to synchronous generator in especially a wind energy power production project?
What is meaning of out of phase (making & breaking) capacity And how to calculate
Why induction motor is widely used in industry
ACB & VCB how do work and saftes and how can maintenance in this and parts name show with picture
if any house we instaled a 1.5 ton ac and its phase cable of wiring is installed but netrual cable of wiring not instaed. my question is that is neutual of house(for other wiring is capable for ac load or a sepeart neutrual wiring required
how indusrial diesel generator work
How to do cable earhing? whether by grounding Armour to ground or by running extra G.I wire along with cable? which one is preferred mostly amoung them? If the second one is more preferable how many GI wires to be run along with cable (1 or 2)?
What is a differential amplifier?
which pump used in WTP explain the function of VFD how to dtermine capacitorbank of capacity one plant
Is there any rule to select the voltage of motor based on KW rating? What is the rating above which lt motor becomes the HT motor?.
what is Insulation monitoring device. where it is used? (in switchgear room or control panel or in field equipment)
what are the difference between AC lamp and DC lamp
What is a dominant pole?
I want to merge a cable..in between two metering Cubicals which contains CT's and PT's and Energy meter..before taking merger..what are the common things required?