Answer Posted / manish kumar meena
Lightning arrester is a protective device which conduct
high voltages surges on the power system to the ground.It
consists of spark gap which is connected in series with the
non-variable resistance,its connection is that one end is
connected to the terminal of the equipment which is to be
protected and other end is effectively grounded.
The property of non-variable resistance is that it offers
low resistance when voltage is high.
Is This Answer Correct ? | 24 Yes | 1 No |
Post New Answer View All Answers
What is the lower limit of break-down voltage of converter transformer.
what is The difference between national electrical code and I.S.Code (electrical) and what is the value of NEC in electrical engineering field
what will happens if one phase is missing for 33/11kv power transfomer and why?
How to calculate the sag on transmission Lines.
how can service sitting be setted for MCCB?Example for sittings IR (CURRENT RATING),IS(CURRENT STARTING)IO (current operating
What is your acheivements
How does "OUT OF STEP" relay ,for Synchronous motor protection, work?
Give the topology of current amplifier with current shunt feedback?
What is the different between conventional MCC and intelligent MCC? Common controller or controller for each bucket
I WANT TO know WHICH WAY IS BETTER FOR CONNECTION BETWEEN POWER TRANSFORMER AND MAIN DISTRIBUTION PANEL. 1-IS BETTER WE USE CABLE? 2-IS BETTER WE USE BUS DUCT? my transformer rate power is 2500KVA
WHAT IS SHORT CIRCUIT STRENGTH OF 100 AMPS MCCB?
lorteny method
hi i have applied for lic of india south cenrtal zonal ,hyd. i didnt get hall ticket till now.let me know how can i get form internet
what is the effect of connecting three phase supply lines to three phase auto transformer output terminals through a fuse of 10Amp and a circuit breaker (MCB). Is this connection permanently destroy the transformer?
In our factory so many iron pillors are exists for supporting the shed/Hangar. If do more no of earthings at one piller instead of doing more earth pits in many locations and running earth strip around the hanger, I can save the money. Please suggest this method is acceptable as per Is specifications though the Earth resitance of the farthest piller is with in the limits as per IS specifications.