in dc shunt generator field is open in running condition
what will happen?
Answer Posted / v.selvakumar
n=emf/flux according to this formula field open means flux
will be zero.flux zero means speed will be infinity,but we
know that no machine can't reach infinite speed.so that
therotically ok but practically starting speed will
increase then it will reduced zero.
| Is This Answer Correct ? | 3 Yes | 11 No |
Post New Answer View All Answers
What are electric motors?
what percent do you derate your copper wire when you change from copper buss to copper wire
What is true sine wave or pure sine wave inverter?? Is it sine wave or step wave?? If it is step wave, waves with how much step is considered as pure sine wave? Is it possible to produce pure sinewave using power electronics?
what is the use of current transformer in power transformer secondary side.?its connectyed in WTI
What is the name of the winding from which the supply is taken for load connections?
Why do we apply both Differential and REF (HV and LV) protection schemes on YNyn configuration of a transformer?
What is nyquist contour?
How the setting of the vector surge relay shall be calculated when the relay is to be used for Grid islanding application?
Can I use distributon class/transmission class Lightning arresots for protecting the building? If not why please explain?
1. transformer design formula ? 2. how to calculate the primary turns and secondry turns ? 3. core types ? 4. how to find the primary current and secondry current ? 5. how to calculate the stacking factor ? 6. range of fulx density ?
please anybody help me to find out the BHEL trainee Exam previous year questions papers . if u ve pls. send it to surekhared@gmail.com
what are the differant std sizes of cable trenches?
What should be the Sandwitch type Al. bus bar capacity for 2 M.W.Gen. set, having continuous full load current- 3463 Amps,ambient temp.- 50 Deg. C., Required temp. raise-20 deg.C., it will run 24 hrs, 365 days on full load, required highly reliable.
what is the difference between switch yard to residential area.and how much required it.
What is the criteria that generally follow by distribution licenses to fix contact demand of their industrial customers?