Question { Cognizant, 10747 }
I have a job (4 steps) with time parameter coded in job &
exec, say time=10 in job & time =3,2,2,4 in each steps.
Will the job executes successfully?
Answer
When the time parameter is mentioned in step and job card, then time parameter at step will take precedence. So only when the steps executing more time than the time limit mentioned in the step will cause the job failure with S322.. it does not consider the time parameter on JOB card.