kishore


{ City } vizag
< Country > india
* Profession * electrical & instrumentation engineer
User No # 112561
Total Questions Posted # 1
Total Answers Posted # 2

Total Answers Posted for My Questions # 0
Total Views for My Questions # 1425

Users Marked my Answers as Correct # 0
Users Marked my Answers as Wrong # 0
Questions / { kishore }
Questions Answers Category Views Company eMail

Sir, My doubt on cable sizing calculation, Load:74 KW calculated cable 1 run 50mm2. Now client asking us to reduce cable size by increasing runs. Sir, My question now when my mind strikes with 2 options 1) Divide load 74/2 = 36 and calculate cable for 36+36 making it 2 runs or 2) Simply i can divide 50mm2 /2 ie. 2 runs of 25mm2 Please suggest me sir

Electrical Engineering 1425




Answers / { kishore }

Question { 5203 }

what is latent heat?


Answer

Dew point temperature, where there will be no temperature change occurs but phase change will be there liquid to gas.

Is This Answer Correct ?    0 Yes 0 No

Question { Orchid, 4011 }

Which standard of hazardous area classification used in India?


Answer

Indian standard is IS.5572.2009 and
IEC standard is IEC 60529

Is This Answer Correct ?    0 Yes 0 No