How can you add value to this Industry if offered the job?
what are the duties of Site Engineer in work site?
How will you Engage Labours on Site?
Prepare a Schedule for a Highrised building from starting stage to Handover?
How To Convert Apparent Into Real Power Without Knowing Reactive Power?
what is there inside an inverter and how it works?
what is different between phase and netural
VAT and CST ? Which benefits for buyer ? Why benefits?
How to calculate multiplication factor in kva example 500kva ans pls ?
at which depth the construction of tunnel is economical from cost and engineering aspect.
I have problem in APFC panel -0.44 while load ON time, i have replaced APFC display & checked the CT supply are ok. how to solve the problem
Curing time for 1)R.C.C slab 2)B.W 3)Plastering
A 400KVA transformer has 400 Hz frequency. If the frequency is changed to 50 Hz, then what will be the new KVA rating?
How the circuit breaker is selected for Induction motor of 100 kW, 415 volt, 0.85 power factor, 0.95 efficiency ?
what are the five benefits of using standard terminology in the measurement process?