For making a new road in a village having a school & hospital , tell the steps of construction systemically ?
What is the settings of distance protection relay in 400 kv line
How to calculate Acctually Brickwork Quantity in Honey Comb Brick in circular Soak Pit
Why earthing is necessary for any equipment?
How we can calculate the life of Lead acid battery
Turbidity analyzer working principle ?
ORP sensor working principle?
How to calculate dry of volume of concrete constant?How it comes 1.54 or 1.57
plumbing CPVC fitting FTE Brass full form
Temperature closer for brazing operation is-------
A commercial Building is designed with 14th floor levels with indoor substation of three phase transformer with rated capacity of 1000 Kva.The transformer delivered 65% of its rated capacity at 0.67 power factor lagging.Because of low power factor, the power customer was penalized and certain cost was charged accordingly based on every point percentage lower than 85%.This situation may repeatedly happen on the succeding energy bills of power customer.The power customer is desired to improve its historical power factor of 0.67 lagging and no further penalty be impose by the local power company on the next bill. Q: Identify the appropriate solution you want to offer to Client?.Justify SCIENTIFICALLY and MATHEMATICALLY the principles behind the solution.
How does your previous experience relate to the job you are applying for ?
What is the effect on Power factor and capacitor when your company load is more than 70 % of welding transformer
How to protect a Dosing pumps/any sensitive equipment (single phase) from surge protection inside a food factory.
en 19 & en24 which one is good for pipe mill shaft