what is the calculation of selection ofan capacity is 12000m3/hr.
what are the specifications we must look at to select a relay for any capacity motor?
How do we arrive at selecting reactive capacitance value as 30% of h.p rating of motor?
Loop check when we do ???before solo run test or dis two activities not related .plz explain me
where cascade loop use ?
principle of dead weight tester ?
use of split range ? where it is used ? in which control loop it is used ?
Hoew to represent unilateral tolerance, as Bilateral tolerance in engg drawing...? Example: 1.295 +0.000 and -0.10, as unitolerance, write the value in bilateral tolerance?
sir I got selected in rail vikas nigam limited and they call for interview but i don't what they will ask in interview please guide me if you have any experience
what is the different between view and materialized view in oracle DBA?
what's the defiance between T beam and inverted beam.
Cement consumption of one cubic meter of aerocon blocks masonry?
I want to know the material required per square foot in rcc roof. i.e. steel: kg/foot, cement/foot etc.
how to electrically make connection to ferroli GN2N?
why we use for testing of compression strength concrete the size of specimen 150x150x150. why we are not using another dimension like 100x150x100 uneven dimension.