describe the principal features of a positioner
How can we choose the rating of submersible motors
How much cement and sand required for 9"brick wall per square metre
why Induction Generators are not "Black start" ? and apart from WTGs where this types of generator are generally used?
Draw the DOL starter and star delta starter drawing?
How to determine spacing of bars in slabs or beams
How many types of oil using in H/T & L/T Oil Circuit Breakers. need Explenation ?
what is zinc diffusion?
explain with a suitable diagram how a vidicon pick-up tube is employed in a monochrome TV camera to develop luminance signal
why three pick-up tubes are provided in a clour camera?
what are various part found in vapour absorption machine and its working
My daily concrete volume of M25 concrete is 1st day= 25 Cum 2nd Day = 45 Cum 3rd Day = 55 Cum 4th Day = 22 Cum 5th Day =72 Cum 7th Day = 49 Cum. What will be acceptance criteria of concrete considering as per is 456 cl.15 and table 11 (cl 16.1 and 16.3).
how to calculate the mesh earth network resistance in such substation, is there any recommended resistance values with references , thanks!
from one meter cube of stone masonry structure how much cubic meter of cement mortar we use as our estimation 25-30% is that correct for estimation of quantity of sand and cement(2:1) proportion of mortar
what should be the PCC ratio to construct a plinth of (40x40x4)ft...??also its estimated cost??