What is quantity of cement and sand required for 2000sqft of tiling?
what are the main problems of solar electrical systems? to make quality control on, which parameters that need so?
what are the main challenges with solar energy system?
what is mppt (maximum power point tracking ) and how they used in solar power generation ??? what are the main components used in mppt?????
If a slab concrete is placed with M-20 grade concrete, actually it has to be placed with M-30. what are the rectifications / measures to be taken after concreting is done.
How much material will consume for following specification water tank (9*7.5*6 feet)?
for G+2 residential building how much quantity of required in foundations,sub & superstructures per sq ft area
to minimize budget cost of building , what can i do
What Should be the value of Vector Surge angle at Tripping and how to calculate it?
can any one tell in easy method for circulating current ??
delta motor winding resistance I take normally single winding is 2.5, which value is came delta connection ie RY ?
how withstand of hi-pot test outputs of transformer wire 2.5mm
I want to know the questions asked in ONGC interview(after being selected in the written exam) for Instrumentation branch.Kindly help.
is there any thumb rule for calculating construction cost of the building with pile foundation per sft. area?
suppose we have a tendency to make a hole on the surface of the simple supported beam, than where we goes to make it?