How is time management and payroll is integrated?
We have two storage locations are ‘0001’ and ‘0600’. Default storage location in process order is always ‘0001’ what determines this default location?
What is costing? How it is affected the pp?
What is the use of stock requirement list?
How the process time is calculated in a wc when both labour, machine categories exist?
In project the customization is comes under which phase?
How to move to the realization phase?
What are some important tables used in pp (production planning)?
Explain what is the need of mrp list if the stock requirement list is already given?
How you get the ticket?
What is the use of infogroups?
Explain the uses of the simple maintenance interface?
Can't one material be assigned to more than one operation in a routing?
Where we have to specify the teardown time in one operation?
How to insert an inspection checkpoint at the end of an operation?