What is SOP and types of SOP?
Explain Flexible Planning procedure or How many levels of Flexible planning.
What is Material status and which view of the material master it is available?
What is Production scheduling Profile and use of it?
Difference between byproduct and co-product.
What is planned consumption and unplanned consumption?
What are the different type of BOM usage?
Which BOM item category you have used?
Difference between Item categories or what is variable size item or non stock item.
What is alternate item group?
What is recursive BOM
What is alternative BOM, or diff between BOM group and Group BOM?
Difference between Routing, Ref op set, Rate routing and Ref rate routing.
Steps to configure Production order type.
What are the parameters are there in Order type or in dependent para. config?