Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

Topic :: Power





Power Interview Questions
Questions Answers Views Company eMail

ENVIRONMENTAL ENGINEERING - QUESTION 22.1 : In order to predict the wastewater production, the population number has to be understood. The population data is : 72000 (for year 1961 or P-1961), 85000 (for year 1971 or P-1971), 110500 (for year 1981 or P-1981). (a) Find the average population increase, or [ (P-1981 - P-1971) + (P-1971 - P-1961) ] / 2. (b) Find the average percentage population increase, or [ (P-1981 - P-1971) / P-1971 + (P-1971 - P-1961) / P-1961 ] / (2) X 100. (c) Find the incremental increase or P-1981 - 2 (P-1971) + P-1961. (d) Let Po = P-1981. After 2 decades or n = 2, the population is P-2001. By using arithmetical increase method, find P-2001 = Po + n (Answer for a). (e) By using incremental increase method, find P-2001 = (Answer of d) + n (n + 1) (Answer of c) / 2. (f) By using geometrical increase method, find P-2001 = Po [ 1 + (Answer of b) / 100 ] ^ n where ^ is power sign, or 1 ^ 2 = 1 x 1 = 1. (g) If the actual P-2001 = 184000, which method of estimation is more accurate, based on your answer in (d), (e) and (f)?

1 2301

NATURAL GAS ENGINEERING - QUESTION 26.2 : (a) The Hyperion sewage plant in Los Angeles burns 8 million cubic feet of natural gas per day to generate power in United States of America. If 1 metre = 3.28084 feet, then how many cubic metres of such gas is burnt per hour? (b) A reservoir of natural gas produces 50 mole % methane and 50 mole % ethane. At zero degree Celsius and one atmosphere, the density of methane gas is 0.716 g / L and the density of ethane gas is 1.3562 mg / (cubic cm). The molar mass of methane is 16.04 g / mol and molar mass of ethane is 30.07 g / mol. (i) Find the mass % of methane and ethane in the natural gas. (ii) Find the average density of the natural gas mixture in the reservoir at zero degree Celsius and one atmosphere, by assuming that the gases are ideal where final volume of the gas mixture is the sum of volume of the individual gases at constant temperature and pressure. (iii) Find the average density of the natural gas mixture in the reservoir at zero degree Celsius and one atmosphere, by assuming that the final mass of the gas mixture is the sum of mass of the individual gases. Assume the gases are ideal where mole % = volume % at constant pressure and temperature.

1 2088

NATURAL GAS ENGINEERING - QUESTION 26.3 : The United States of America Energy Information Administration reports the following emissions in million metric tons of carbon dioxide in the world for year 2012 : Natural gas : 6799, petroleum : 11695, coal : 13787. Coal-fired electric power generation emits around 2000 pounds of carbon dioxide for every megawatt hour generated, which is almost double the carbon dioxide released by a natural gas-fired electric plant per megawatt hour generated. If 1 metric ton = 1000 kg and 1 pound = 0.4536 kg, estimate the total energy generated by natural gas in the world for year 2012, in gigawatt hour.

1 2721

why is the power generator connected as star earthed or star earthed through reactance and what its features ?

1639

why SCR use in power plant

Edison,

1 2314

What is power factor why we should maintain the power factor unless what will happen

1873

Difference between control junction box (cjb) and power junction box(pjb)?

4269

Actually I have a doubt on neutral and earth.we use Ac power without taking neutral by connecting to earth,but at that time does it affects on efficiency of any electrical components or no? If yes how?

1355

Post possible questions for Power Factor Panel FAT / SAT

1378

what's the difference between 'shaft power demand' and 'BHP' , when we consider electrical load list.

HEC,

1485

What's the difference between non break power supply and non break non short break power supply

1418

Ratings of power transformer,Distribution transformer.

1573

for what voltage will reactive power be largest in 380 kv line : a) 375kv b)380kv c)385kv

1444

QUANTUM BIOLOGY - EXAMPLE 33.4 : (a) According to Landauer (1986), the capacity of human memory is approximately X bits. Assume that a human retains 2 bits / second of visual, verbal, tactile and musical memory, find the value of X if a human lifetime is approximately 2.5 billion seconds. (b) The total power consumption of the human brain is about 25 Watts. The bread of 100 grams will produce 1000 kilojoules of energy. How much bread is needed to run a human brain for 1 day?

1 2210

before synchronizing an alternator,power factor is leading ,why?

CUMI,

1521




Un-Answered Questions { Power }

Difference between PowerPlay transformer and power play reports?

2498


How would you compare the computational power of a cortical pyramidal cell with that of a desktop computer?

1917


Power grids in two adjacent states(A&B) are interconnected. Can power grid in state A can be represented by Thevenin Equivalent Circuit. If not explain Why?

2331


What work have you done on full chip Clock and Power distribution? What process technology and budgets were used?

2858


What work have you done on full chip Clock and Power distribution? What process technology and budgets were used?

3233


How to create a power function?

1972


Is it possible to do load testing in POWERMHS? If yes how do you do that?

3354


Hi friends Does anyone have screen shot of POWERMHS and please can anyone post anything which will be helpful to understand POWERMHS. thanks.

3028


what is the day to day work of SAP FICO Consultant. which are the documents,white papers he uses. who will assign him work and in what form, is it a flowchart,word document,power point presentation ?and also what is business blue print and how it is documented(word,flow chart),?? please answer my question

7238


SIR I M STUDENT OF POWER ENGG CAN I GIV PSU XAM 4 NTPC AND WHAT WOULD B THE PROCEDURE

2106


what is power prompt in cognos ep7series?what is the use of this?

3665


what are the advantages of power point presentation with the help of examples.

2193


how can we Upgrad the reports from version Impromptu 6.0 to 7.0 and Power Play from version 6.6 to 7.0 ?

2254


why should we choose VSTET(Visual Studio Team Edition for Testers) and not QTP?pleas give me the reasons for "WHY" we have web and client server app, supports power builder and on windows OS so this is the background of tech and envir things we have and now VSTET is good to use or not? if "NO" then tell me why

2242


I just want to convert the voltage into current i.e. suppose I have 750V & 1A AC power then I want to convert it into 12V & 62A DC power only difficulty is that I don't want to use the tranceformer. Simply to say, I want to make the step-down without using tranceformer. Please, give me some ideas. And also I want the relation between Magnetic Induction & Weight of the body can be levitated. Or I can say, how much of magnetic induction requires to lift 500gms weight? I am heartily thankful to you.