what are the priliminary expectations from smoke testing
from developer and QA point of view
No Answer is Posted For this Question
Be the First to Post Answer
Explain the deployment process?
How to calculate decision table conditions and actions on the following questions. The following specification is given: A railway has four different kinds of accommodation with different ticket prices: Hard seat, soft seat, hard sleeper, and soft sleeper. For hard sleeper, there are different prices for lower, middle and upper berth. For soft sleeper, there is a different price for lower and upper berth. For sleeping accommodation, different prices apply for non-air-condition and aircondition. For soft sleeper, a higher price applies for compartments with own bathroom. High-speed trains exist, but have only hard and soft seat, and they have another price than “normal” trains. How many different valid combinations of inputs exist for computing the price? a) 12 b) 16 c) 18 d) 36
What are the main objectives of configuration management and version control?
which electronic company offered industrial visit in chennai?
Our is a small Software Company. What is the process if we need to achieve CMM level 3?
What are the beta test and alpha test?
how to calculate defect density rate and what are the retrospective mesures you have experienced / taken to reduce the same
anybody wants the industrial visit in chennai and banglore,kindly contact me?
what is difference between get and post method in load runner or it same as the concept in html form
Hi I want to test regarding cookies.. Session should be good for 4 hours and once expired user is returned to login page.. How can i test the session is good for 4 hrs?? Whether i need wait for 4 hours?
is QA expects any level of interaction from development engineer !!!
Hi Friends... I faced an question in Tcs.But i unable to answer. find the question below.. A root filesytem"c0t0d0s0" caries 100 gb data. in this filesystem. i am having 3 files named a,b,c it caries 20 gb data each. I need to take backup only 3 files a,b,c. How i can take. Note you need to take only 3 files to an single tape having capacity 80 gb. Whats the commad used?