Find the speed of the boat in still water if the river runs at 4 km/hr. The time taken by a Suresh to row the boat upstream is 3 as the time taken by him to row it downstream.


No Answer is Posted For this Question
Be the First to Post Answer

Post New Answer

More General Aptitude Interview Questions

If A driver drives a car four times a lap 10,20 30,60 kmph what is his average speed.

1 Answers   IBM, Mecon,


Two circles , one circle is inscribed and another circle is outscribed over a square. What is the ratio of area of inner to outer circle.

5 Answers   CMC, Ramco,


A power unit is there by the bank of the river of 750 meters width. A cable is made from power unit to power a plant opposite to that of the river and 1500mts away from the power unit. The cost of the cable below water is Rs. 15/- per meter and cost of cable on the bank is Rs.12/- per meter. Find the total of laying the cable.

0 Answers   Accenture, BSNL,


why do we select u and what value added services that u will add to our company?

3 Answers   Automation, Ranbaxy,


In a row of girls, Bina is 5th from the left and Priyanka is 6th from the right. When they exchange their positions, then Bina becomes 13th from the left. What will be Priyanka?s position from the right ? (A) 14th (B) 7th (C) 11th (D) 18th

5 Answers  






When an object like cube or sphere is seen along x,y,z,axes we get the same.Apart from these suggest another which has similar characteristics?

2 Answers   Aspire, Geometric Software, Neilsoft,


A started at 9.00 am with 6 mph and B started at 9.30 am with 8mph in the same direction. At what time they will meet?

6 Answers   CitiGroup, Ramco,


A pipe can fill a tank in 30 min B can fill in 28 min then if 3/4 th of tank can be filled by B pipe and after wards bothare opened then how much time is required by both the pipes to fill the tank completely. note: the values of A and B may slitely vary be ware.

0 Answers   IIT Delhi,


A finishes the work in 10 days & B in 8 days individually. If A works for only 6 days then how many days should B work to complete A's work?

0 Answers   Accenture, BSNL,


HOW + MUCH = POWER Then P + O + W + E + R =

0 Answers   Infosys,


A man leaves office daily at 7pm. A driver with car comes from his home to pick him from office and bring back home. One day he gets free at 5:30 and instead of waiting for driver he starts walking towards home. In the way he meets the car and returns home on car He reaches home 20 minutes earlier than usual. In how much time does the man reach home usually?

7 Answers   3i Infotech, Canara Bank, EDS, Oracle, Tesco,


if the value of nomo is 2,chotr is 4,meraca is 3 and wats the value of nuslasgses

5 Answers   Genpact,


Categories