Company Name Starts with ...
#  A  B  C  D  E   F  G  H  I  J   K  L  M  N  O   P  Q  R  S  T   U  V  W  X  Y  Z

  • EXL aptitute test questions (5)
  • EXL interview questions (59)
  • EXL placement papers (2)

EXL Interview Questions
Questions Answers Views Company eMail

why you swtichover that the company

3 4414

how many round takes EXL company for non voice process. and what is that rounds.


They take any typing round or not?

1 1957

what type of aptitude question they ask for interview?


what will the Next no. 10,20,30,68,__

7 8812

Post New EXL Interview Questions

Un-Answered Questions

where can i get the course for automobile engineering in delhi?


function of body system


how can we maintain the previous version scripts to new version.


What is the difference between Hinged and pinned in Column ends


I need help with the following lab. Can anyone explain it to me on how to approach this problem. Coding would be great too !!! No busy waiting allowed. Remember that Java monitors are 'signal and continue'. The input data is called the database (DB). In this problem, it consists of a single variable initialized in the main thread, to contain the current time of day in HH:MM:SS:mmm format (mmm is milliseconds) truncated to 3 digits. Threads follow these rules: 1. Readers may all attempt to read at the same time, but NOT if a writer is writing (i.e.; the writer is in the monitor. 2. Writing is exclusive (only 1 writer at a time, no readers while writing). 3. Options: (to be specified by instructor) a. Readers have absolute priority over writers. b. Writers have absolute priority over readers c. When a reader arrives and a writer is waiting, the reader is suspended behind the writer instead of being admitted immediately. Thus, a writer waits for readers that were running when it arrived, but does not to wait for new readers. You may program this in C++ or Java. There are 4 controlling input values: 1. r – number of readers 2. w – number of writers 3. R – delay for a reader to restart 4. W – delay for a writer to restart Create the following program consisting of 1 main process (your main program) with n threads: 1. The main thread: a. Creates the 'n' threads needed. Of these, r of them are readers and w of them are writers. Starts all readers and writers. b. Waits for all 'n' threads to complete. You may use any method to detect when they are all complete. c. Prints out the resulting outputs from the threads. 2. Threads: a. When a thread starts to run, it immediately tries to enter the monitor. b. A reader thread reads the DB, outputs the exact message below, then exits: >>> DB value read =: HH:MM:SS:mmm by reader number: rr where the underlined text is replaced with actual data. c. A writer thread updates the DB with a new value (from the system time), outputs the exact message below, then exits: *** DB value set to: HH:MM:SS:mmm by writer number: ww where the underlined text is replaced with actual data. d. Each thread accesses the data a total of 10 times, exiting, then re-entering the monitor after each access. Hints: 1. File access *might* not be thread-safe, so you should be prepared to handle this. Read the documentation for the language you are using. 2. Suggested values for delays are: a. If looping, R >=1,000,000 and W>=100,000 b. If using “sleep”, then R=100 ms, W=50 ms. Additional: • Thread output is to ONE file used by ALL threads (so you need to synchronize access to it). • Readers must provide sufficient delay that results are useful (delay by R before re-trying). R is another input value. • Writers must also delay. Delay by W, updating the DB each time. W is an input. • Test your program with AT LEAST TWO different sets of values for r and w (#s of readers and writers) plus this set: r = 4, w=2. Basic operation of a thread: attempt to enter the monitor. If unsuccessful, you get put on a queue. When you get in, read or write the data (depending on type of thread), exit the monitor, wait the required delay amount, then try again. Repeat 10 times.


what is the dictionary objects in QTP? and what is method of vb script using virtual object wizard........


What does GEQO stands for in PostgreSQL?


How Work Manager works in wls 9.2 and above versions?


What is vane diagram in centrifugal pump?


A 3-phase IM is supplied from 50 Hz system. It runs at speed of 1440 rpm and slip equal to 4 %. Calculate number of pole pairs. A 1 B 6 C 2 D 3


What are the future plans for Apache?




how to access a build & wat is its configuration


what is the meaning of Field Level Validation & Form Level Validation??


without table how to come first record only in oracle?


EXL Interview Questions
  • Dot Net Framework (1)
  • Test Cases (1)
  • COBOL (1)
  • RPG400 (1)
  • Informatica (1)
  • SAS (2)
  • HR Questions (1)
  • SAP HR (1)
  • Oracle Apps Technical (1)
  • Mechanical Engineering (1)
  • Banking Finance (1)
  • Human Resources (1)
  • Taxation (3)
  • Accounting General (5)
  • Accounting AllOther (1)
  • Call Centre AllOther (37)
  • POs (1)
  • General Knowledge_Current Affairs (1)
  • Law AllOther (1)
  • General Aptitude (1)
  • Puzzles (1)
  • Placement Papers (2)