A generating system will have a total capacity of 300 MW. Find the probable forced outage when the capacity is supplied by two 150 MW units. The operating probability of all units is P=0.98 and forced outage probability rate Q =0.02 .
2621Post New BUET Interview Questions
What is fail fast in java?
What is the use of hooks in codeigniter?
What accounts are to be debited and credited in this case o
Can I set folder qouta on server 2003 SP1 enterprise edition setup as file server? Can I use FSRM on this or do I really need to update my server to 2003 R2? Thanks.
Does django use bootstrap?
Differences between connected and unconnected lookup?
What do you mean by route groups used in laravel 5?
Explain magnetic amplifier?
explain about maximo workflow nodes?
How can constructor chaining be done using this keyword?
How to enable mvc annotations in spring?
I want to join for load runner training..please suggest me which is the best institute for load runner training in bangalore?
5. What is the maximum transmit power of FlexiEdge BTS
True or false question. 1.The fuse provide phase and neutral 2.power loss in electrical circuit can take place in (resistance or inductance or capacitance). 3.two phase system each phase has separated by a phase difference of (90 or 180 or 270 or 45). 4.3 phase balanced star connected load neutral current shall be (line current or phase current or zero or unity)
What are the benefits?