A generating system will have a total capacity of 300 MW. Find the probable forced outage when the capacity is supplied by two 150 MW units. The operating probability of all units is P=0.98 and forced outage probability rate Q =0.02 .
2624Post New BUET Electrical Engineering Interview Questions
how can i apply patches for bi7.0 componenet without user id and password of SAP?
Is python client or server side?
What is aura? Why do we use the aura: namespace in the code?
What is an oracle data file?
Explain different pipelining hazards? : Dot net architecture
If combination product how require to identify which imp is of which api?
did any one attended interview in applabs if you had gone through plz tell me the procedure
Can you nest flexbox?
What is the difference between driver.close() and driver.quit command?
What is the difference between a function and a trigger?
How do we create a client in the mm module?
How do I find out what program is using a port?
What is Cycle Stealing in OS?
How can I use a stored procedure in a mysql database with zend framework?
What are skinny tables ? What are they used for ?