Company Name Starts with ...
#  A  B  C  D  E   F  G  H  I  J   K  L  M  N  O   P  Q  R  S  T   U  V  W  X  Y  Z

Steel Plant Interview Questions
Questions Answers Views Company eMail

what is a far pointer

12 34460

Asia?s largest wind farm of 28 MW is located in which of the following states? (A) Madhya Pradesh (B) Gujarat (C) Rajasthan (D) Maharashtra

5 9515

how much salary r u expecting?

7 12502

Rourkela Steel Plant was set up in Collaboration with 1 Germany 2 Britain 3 Sussia 4 France

5 9359

I want question papers for khalasi, gangman, trackman, safaiwala, etc., urgent.Recent question papers.

19 29791

if you short the any 2phase(R,Y,B),why fuse get blown?

5 8525

I am applying for vizag steel plant management recruitment for 2009 please can anybody send me the pattern of the written test paper

31 28489

please give me the syllabus and sample questions if possible for Instrumentation for Vizag Steel plant MT (Trainee) 2009 exam

1 6331

how many frequent start/stop operation possible in case of HT MOTORS.

5 15374

Diploma Mechanical Engineer i had attened more over 100 interviews they are all asking the same question "TELL ME ABOUT YOURSELF"

3 59764

what is the differnce b/w voltage and current

8 9835

what is %impedanece

3 6571

how many types of threads are used in mechanical industry

18 58651

Lamps in street lighting are all connected in a) Series b) Parallel c) Series parallel d) End to End

9 128652

Why PWHT IS NOT DONE TO STAINLESS STEEL MATERIAL?

5937

Post New Steel Plant Interview Questions




Un-Answered Questions

what are the adaptations of desert plants like cactus?

1592


Explain what does $_server means?

562


Does spark use mapreduce?

186


Is downloading java safe?

468


You are a project manager for an agricultural supply company. You have just completed and obtained sign-off on the scope statement for your new Natural Bug Busters project. A key stakeholder has informed you that a deliverable is missing from the scope statement. This deliverable is a critical success factor. You should do which of the following? A. Inform the stakeholder that work not stated in the scope statement is excluded from the project. B. Modify the scope statement to reflect the new deliverable. C. Inform the stakeholder that this deliverable can be included in the next project since sign-off has already been obtained. D. Modify the scope statement after an approved change request has been received from the stakeholder.

530






List the difference between interface and abstract class?

461


how to calculation increase capacitor,increase power factor for three phase.

1623


give an example of risk that you had to take. Why did you decide to take the risk?

737


How we can change the entry point in WPF application?

107


What is the relevance of 'Weight/Volume Relevant' tab in Credit Memo Request and Debit Memo request as in both, it is checked at item level? As I know, it is being used to re- determine route at delivery level.

2181


Is python is a case sensitive?

451


How can you stop your dba from making off with a list of your users’ passwords?

589


CBCT selection

1785


How many types of graphs are available in loadrunner?

578


Name few of the properties of blockchain?

1