Company Name Starts with ...
#  A  B  C  D  E   F  G  H  I  J   K  L  M  N  O   P  Q  R  S  T   U  V  W  X  Y  Z

  • Adani interview questions (44)
  • Adani technical test questions (10)



Adani Power Plant Engineering Interview Questions
Questions Answers Views Company eMail

what is IR in differential test on motor?

2 6519

what equipment is most efficient in power plant?

4 9897

Post New Adani Power Plant Engineering Interview Questions



Un-Answered Questions

IN MY SYSTEM THERE IS ONLY OVER CURRENT EARTH FAULT RELAY IS AVAILABLE. FOR THE UNBALANCE SENSING IS THERE ANY RELAY IS AVAILABLE? THE SAME CTs WHICH ARE USED FOR THE OVER CURRENT EARTH FAULT RELAY CAN USE FOR UNBALANCE ALSO?

1964


Why might the optimizer use a table scan when an index is available?

1065


we all know voltage is a force(emf), and the force always devides if 2 or more than2 loads are there but why does the voltage remains same is parallel, it must devide na ???

857


What is the Systematic Responsibility Site Engineer? Who are the above and under co-oridinating ? What is office & Site co-ordination of Site Engineer?

944


on earth moving road work which type of tax is applicable?

786






Is there any standard procedure to test the application as a whole? Or How can I test complete application right from the requirement gathering?

842


Why do you need to parameterize fields in your virtual user script?

893


how many errors in c explain deply

936


What will be the cause of the loose compression in a cylinder?

1593


what is the scientific name of kingdom fungi?

1648


Why perchloric acid used for potentiometric titration

1396


Dear all, Will some one help me in this issue please? We are entering the Zero Stock Component in Maintenance Order, and we make a Check when the order creator is going to release system will appear Error, until he will not delete that zero stock components from the Maintenance order. but right now what the order creator is not releasing the order but he is going to save order, when's he save the order without release system will generate Reservation in the back ground, which should not happen for Zero Stock Components ? I need the way which we are doing in MB21, Reservation creation by thru Cost Center / WBS Element. At present if you run MB21 and you are going to issue the material system will not allow to generate the reservation if there are zero stock components in the list. please guide me for this issue ? Note : Simple what I need is I don't want to create any reservation thru maintenance order for the Zero Stock Components. Regards, Abdul Mujeeb

696


what is scupper?

1157


in u flatfile some of fact records are missed then u load the diminision records are not if u load diminsion records what about fact table records

931


What is oracle service contract?

701






Adani Power Plant Engineering Interview Questions
  • VB Script (1)
  • SAP ABAP (1)
  • SAP Business Warehouse (1)
  • Civil Engineering (4)
  • Mechanical Engineering (4)
  • Electrical Engineering (29)
  • Chemical Engineering (1)
  • Instrumentation (6)
  • Power Plant Engineering (2)
  • Engineering AllOther (1)
  • Taxation (2)
  • Accounting AllOther (2)