IF we have 500kva transformer 11.0/0.415V, 50Hz. How to calculate the current on HT & LT side, how can we consider for its breaker (HT & LT both)? You are requested to solve the question herewith.
3 14735Post New Bhutan Power Corporation Interview Questions
Differentiate between torque and power.
Define thermal conductivity.
How do I unregister an ocx?
How to check the round duct measurement
What is error code 0xc004f012?
Define Array of pointers.
what are PEG transfection - parameters?
What is difference between save and save as option?
A mass of 1200g is accelerated at 200 cm/s2by a force. The value of the force required is:(a) 2.4N(b) 2400N(c) 240 kN(d) 0.24N
Explain the advantages of jquery?
What is use of Update Panel control in Ajax toolkit?
What is nonatomic and strong in objective c?
What method is used to sort the elements of the array in descending order?
You are a project manager and are in the Closing process of the project. Your customer has been presented with a formal acceptance and sign-off document. They refuse to sign, claiming the product does not meet their expectations. You know that this situation could have been prevented by doing all of the following except : A. Documenting the requirements B. Documenting the customer's refusal to sign C. Performing quality inspections during the process D. Requesting sign-off at important milestones
What is a const pointer?