Consider if there is no Test lead, No Test Manager and QA Manager. If you are the senior test engineer, you are getting pressure from the client to give the build. But you see that, there r 5 high and 5 low sevierity bugs. So, what you will do and how you interact with the client.
14 23730There are 2 bugs A and B. A has High Severity and Low Priority , wherease B has Low Severity and High Priority. Which bug will you give more importance.
12 23262Post New Sonata Manual Testing Interview Questions
Explain me inheritance in python with an example?
Test on three subjects Physics, Chemistry & Biology are to be conducted simultaneously the number of candidates for the tests are 68, 36 and 72 respectively. Candidates are to be seated in different rooms such that each room will have candidates of the same subject and the load on each invigilator be the same i.e. the number of candidates in each room should be the same what is the minimum number of rooms you need for the purpose
Difference between a class and an object?
ongc recruitment sample paper for asst.technician technical
Why article is necessary for seo?
What happens if a function module runs in an update task? : abap modularization
What is .gitignore?
How do you configure mandatory profiles?
How do I find the output type of a table or a program?
The represent number 35 in binary, number of bits required are?
aht is the difference b/w network & hierarchial & relational dbms????
In Third Party sale process, I am getting an error- in MIRO(Error No. M8889-A/c 893010 has been set as not relevant for Tax, but when I want to change the Account Assignment in ME21 it is taking only G/L A/C 893010 and refusing all other G/L A/C's by giving 2 errors. They are ME045-G/L A/c 39010 cannot be used(please correct)and ME038-No direct posting can be made to G/L A/C 34000. Experts please share your knowledge to solve this problem. Warm Regards.
How to create field as mandatory?
We have drive feeding an output contactor for a 5000 hp motor @ 5kV application. The motor FLA is 629amps x 1.25% service factor = 786.25 amps The cable that we current have in place between the drive and the output contactor is 350kcmil- MV-105 (parallel cables). Per the NEC table 310.60 (C) (69). This show the cable ampacity is at 615 amps per cable for a rating of 1230 amps. We have derated the cable for the cable tray and the multiple cables application and our calculations show that after the correction factor factor we are at 922amps. 1230 amps x .75% correction factor factor = 922.5 amps. The customer is driving us to then use another safety factor of .25% off of the already derated cable. Can you please provide a longhand calculation for your solution on this application?
What is DA?