How do determine the Size of a Droop Current Transfomer for Paralleling of Two Generators, Say I need a Droop Current transformer for a 600 kW generator need to be parallel with a 800 kW generator, etc.
2 10096Post New PNG Power Interview Questions
Is There Any Difference In Cloud Computing And Computing For Mobiles?
Hi Suppose we have a wye/wye transformer which is grounded at both sides,in this situation, do we have ay ground transformer? in other words, ground transformer can do any thing more (while we have nuetral wire in both sides)? As the last question, what about 3rd harmonic? we have two choices: first using wye/delta transformer + ground transformer and second using wye/wye earthed connection.in the former choice, we dont have 3rd harmoonic at the secondary side but what about Yn/yn conection? do we suffer from 3rd harmonic in the Yn/yn connection?
What are the important points to remember while using lambda expressions?
What are your eating habits - vegetarian / non vegetarian?
What is url what is the use of it?
How does django session work?
What is the laws of dry or solid friction.
What are the two basic tags in html list?
What does string mean in java?
selling price = shs. 200, variable overhead-selling per unit= shs 80, variable production cost per unit = shs 60, fixed selling cost = 2,840,000. the production capacity of the project is 200,000 units. required P/V ratio, BEP and margin of safety
How can a user confirm whether sap html control is utilized or not?
what sync function does in websphere?
A fan is handling hot air at 285 degC with flow of 411635 m3/hr, power consumed is 1165kW and efficiency is 66%. what will happen to flow, power and efficiency of the fan if a water spray system is introduced to reduce the air temperature up to 200 degC? (also please refer any document regarding this)
is there any entrance exam conducted for the post of drug inspector and what is the usual time
While processing the salary for the m/o May 2012,the following error is being shown: 1.The salaries have been revised w.e.f 01.04.2012 in the m/o May 2012.Hence the May salary will include the arrear of April 2012. 2.Though the processing is successful, the periods reflected as 917 is wrong .Ideally it should be 246(123*2). 3.T-Code is PC00_M40_CALC Please examine the problem asap and revert https://mail.google.com/mail/u/0/?ui=2&ik=5c73645d0a&view=att&th=13787f525b8779c7&attid=0.1&disp=emb&realattid=9a07681551f0b854_0.1&zw&atsh=1