Company Name Starts with ...
#  A  B  C  D  E   F  G  H  I  J   K  L  M  N  O   P  Q  R  S  T   U  V  W  X  Y  Z

  • Asian Paints aptitute test questions (1)
  • Asian Paints interview questions (21)
  • Asian Paints technical test questions (4)



Asian Paints Instrumentation Interview Questions
Questions Answers Views Company eMail

Any can guide for QA/QC Inspector in oil & gas region, the procedures, formats standards, design criteria, i search in all enginees but i can't found wat i need?????????

4 16231

My friend has faced this question! I don't know clearly. So please anyone give me the correct and short answer to this question? What is variable frequency drive? Types, what is star to delta? Why this arrangement necessary?

5 4501

if we open the inlet of an air regulator ,how it will affect the out put of regulator? (out put of regulator is using to operate an on-off valve.it is an air to open valve,and valve is in open position.my doubt is air regulator will hold the valve in open or not,if there is no consumption or leak in regulator out put side ,we only loose the input pressure.)

4 3792

Post New Asian Paints Instrumentation Interview Questions



Un-Answered Questions

A PLC is programmed to drive three motors A, B and C as follows : After running motor A for an hour, motor B should get ON and motor A should get OFF. And after running motor B for an hour, motor C should get ON and motor B should get OFF. And after running motor C for an hour, motor A should get ON and motor C should get OFF. (That is, a cyclic repetition with time period one hour) Now, the second condition is: If any motor gone faulty and is tripped, the consecutive motor should get ON and the faulty (tripped) motor should be eliminated from cyclic repetition. The remaining two motors should bear the cyclic repetition of one hour each. (For healthy motor take logic as high and for tripped motor take logic as low) Now, the third condition is: When motor A load(Amps) exceeds 60% of its rated load, motor B should get ON in parallel to motor A. And when both motors A & B are running in parallel, and if their load exceeds 60% of their rated load, motor C should also start in parallel to A & B. [Here the cyclic repetition is eliminated, until their loads become normal(40%)] [Take logic high(1) for load at 60% and logic low(0) for load at 40%] Now draw a flow chart or a ladder diagram to fulfill the above condition.

898


Do you have reference list?

584


What is CPU (Central Processing Unit)

688


• What are the desirable attributes for memory managment?

797


Describe android Activities in brief.

282






what is the difference between R/3 Number range and CRM range?

1027


if i am in front of transmission line how to know that current direction without any equipment

341


Greeting to all members, How to calculate spill current when we have different ratio CT and Class for REF(Low Imp) I have 500/1A 5P20 @line side n 400/1A CL.X @ Neutral.

1600


why we can use 1 to 5V dc

600


What is MRP Area or How can I excluede one storage location stock from MRP?

173


which type of zones used for boiler? & why ?

658


what is xcelsius architecture?

2870


Write a java program to print the subsets of a string

1147


Does Delphi 5 include Resource Workshop and InstallShield Express?

1030


What is the use of progress Bar Control?

721






Asian Paints Instrumentation Interview Questions
  • HR Questions (1)
  • Oracle Apps Technical (1)
  • Organic Chemistry (1)
  • Analytical Chemistry (1)
  • Pharmacy (1)
  • Mechanical Engineering (1)
  • Electrical Engineering (4)
  • Chemical Engineering (1)
  • Instrumentation (3)
  • Marketing Sales (4)
  • Banking Finance (1)
  • Personnel Management (1)
  • Taxation (2)
  • Accounting General (1)
  • Accounting AllOther (1)
  • Architecture Design AllOther (1)
  • General Aptitude (1)