Company Name Starts with ...
#  A  B  C  D  E   F  G  H  I  J   K  L  M  N  O   P  Q  R  S  T   U  V  W  X  Y  Z

  • AppLabs aptitute test questions (1)
  • AppLabs interview questions (104)
  • AppLabs placement papers (1)
  • AppLabs technical test questions (4)



AppLabs CGI Perl Interview Questions
Questions Answers Views Company eMail

Write a script for 'count the no.of digits using regular expressions in perl..

6 11478

We all know private variables exist in perl. But do private METHODS exist in perl ? Eg ?

1199

Post New AppLabs CGI Perl Interview Questions



Un-Answered Questions

Hi I am searching job please send some details abuot ERP project and real time test plan,traceability report,test case if any relate to erp project Please help me out to get a job in testing.my email address is chiku_69@yahoo.in Thank u

1516


We have got some values for Field F1 say 1,2,3,4 and F2 say 10,10,10,10.Now can you tell me what would be the output for F1 if we use At End Of event?and what would be the output for F2 if we use At Last event?Also i want to know what is the difference between Total calculation for At end event and grand total for At last event???

799


1s it posible to Create Tables Through Querydef?

975


what is the meaning of impedance protected in instrument cooling fan

1296


Can a company deduct TDS & provide TDS certificate for a bill without actually making payment towards the same??

689






How to create an icon from a bitmap?

654


We have drive feeding an output contactor for a 5000 hp motor @ 5kV application. The motor FLA is 629amps x 1.25% service factor = 786.25 amps The cable that we current have in place between the drive and the output contactor is 350kcmil- MV-105 (parallel cables). Per the NEC table 310.60 (C) (69). This show the cable ampacity is at 615 amps per cable for a rating of 1230 amps. We have derated the cable for the cable tray and the multiple cables application and our calculations show that after the correction factor factor we are at 922amps. 1230 amps x .75% correction factor factor = 922.5 amps. The customer is driving us to then use another safety factor of .25% off of the already derated cable. Can you please provide a longhand calculation for your solution on this application?

744


Hi , Does anyone have advanced sas certification latest dumps(a00-212). please mail me to sunnyspells9@gmail.com Thank you sunny

1587


what is the trip circuit supervision in an electrical meaning?

476


what is impact analysis on regression testing?

1250


what is meaning of 230volts ac 50hzs ac supply is it rms or maximum to getting ac 230v what amount of max voltage they will send

666


Please help me by providing the License key for QTP 9.2, at guru_aarya@yahoo.co.in Best Regards Gururaj.B

2121


How do you use the value set in bex query?

1154


How many rejections do you take in a typical week?

1017


Why should we hire you over the others waiting to be interviewed?

718






AppLabs CGI Perl Interview Questions
  • C (1)
  • CGI Perl (2)
  • VB Script (3)
  • Microsoft Related AllOther (1)
  • Oracle General (1)
  • WinRunner (4)
  • Load Runner (3)
  • QTP (25)
  • Silk Test (1)
  • Manual Testing (55)
  • Test Cases (3)
  • Testing AllOther (2)
  • IBM MainFrame AllOther (1)
  • JDBC (1)
  • SAP Basis (1)
  • Oracle Apps Financial (2)
  • Civil Engineering (1)
  • Placement Papers (1)
  • Microsoft Certifications (1)
  • Scripts Errors (1)