Company Name Starts with ...
#  A  B  C  D  E   F  G  H  I  J   K  L  M  N  O   P  Q  R  S  T   U  V  W  X  Y  Z

IntelNet Interview Questions
Questions Answers Views Company eMail

What are the steps you follow when you appraise an advisor ?

1460

Do you have exposure to Quartile management ?

1652

Do you have exposure to Quartile management ? E.g. How will you manage an advisor who is on the bottom quartile for 3 months consecutively ?

1987

How is AHT calculated & How will you reduce AHT

1302

hi, could u tell me how to sell a pen in hindi

1371

Post New IntelNet Interview Questions




Un-Answered Questions

What are the different application servers and web servers supporting j2ee technology?

460


I have been interview in next week my posting is accounts officer i have be manage with AP,AR,BRS and GL what Books i have read.

1558


What is 'capacity planning'?

537


How to call an activity from javascript?

203


What is the credit control area in sap?

621






What is a postgresql cluster?

433


What is the use of the view module?

69


How to select a database in php?

569


What is a clr host?

547


Hi,I am working in abroad for more than 3 years in a company operating with 11kv and 6.4 MW power. I need c licence in India,can I? some other says only i can get if i work for 2 years in india only! anybody kindly clarify by doubt.Thanks

1457


AS PER VAT AUDIT WE HAVE REFUND OF RS.25000/- ON PURCHASE OF FIXED ASSETS WHICH WE DID NOT CLAIM LAST YEAR, NOW WHAT ENTRY SHOULD WE PASS IN BOOK. ITS URGENT

1730


Why doesn’t a servlet include main()? How does it work?

623


CAN WE DETERMINE THE PEAK PURITY IN GAS CHROMATOGRAPHY ANALYSIS?

692


Hi brief the following. 1) How would we can fix the exact machinery for the excavation at construction site. 2)what is mean by 43/ 53 grades in cement? 3) what is the diff between fe 415 / fe500 and what is the usage of two grades. 4)how we can check the exact weight of one truck load of TMT rods. 5) what is the percentage of tolerance of TMT rod while receipt at site. 6) how we can test and evaluate the grade and quality of timber while receiving at construction site. 7) how we can select the right plywood for shuttering 8)what are the diff grade of RMc and how we can select the right RMC for the specific work 9)what is the ratio for binding wire for 1 ton of tmt 10) how we can select the quality bricks. what are check measures. 11) how we can select and procure the river sand for construction purpose. 12) how we can recon the store materials with actual purchased at construction site. 13) what are the documents required to transfer our own material from one site to another site between two states. 14) what are the different types of formworks and its usages 15) what are the diff types scaffolding materails and its usage 16)how we can select the right tiles for flooring, wall and other areas. 17)what are the diff types of tiles and its usages 18)what is the procedure to select the tiles for construction 19) what is the calculation method for no of tiles received at site 20)what is the common procedure to codify store and scaffolding materials at construction 21)how we can select the right granite/ marble / kota stone for the specif usage at site. 22) what are the basic items for site mobilization 23) what are the step by step construction process. 24) how we can select the right timber for doors at site.

1673


explain the reduce() function?

521