Draw SLD feeding from the SS up to distribution board of the load, calculate cable size, breaker sizes, and meter for the following case: Ground Floor: electric room, pump room, 5 shops, each is 15 KW First Floor: 5 shops, each is 15 KW Second Floor: showroom 30 KW Service Loads: water pump 3 KW (3ph) , fire pump 3 KW (3ph), and one DB service 12 KW (3ph).
1421Draw an S.L.D of the main panel for a hospital, showing meter position. Essential loads are: 1) Equipment load 100 KW 2) Critical load 500 KW 3) Life AID Safety load 400 KW 4) NON-Essential load 200 KW 5) Other service loads 200 KW Calculate and suggest the size of the transformer, size of main cable, capacitor bank, and calculate the capacity of an emergency load having above first three mentioned loads is supplied by an emergency generator.
1226Give accurate definitions for these electric terms: Inductor Inductance Inductive Induction Reactance Reactive Esam Baraka ٢١ ساعة
912Post New HMK Interview Questions
What is a rootkit virus?
How do I insert multiple rows in excel 2016?
have 3 tables table1, table2 and table3 which contains employee information. table1 is master table, table2 contains emp details like emp no and so on, table 3 contains emp salary. so if any emp leave company between 25th - 30th of every month it has to get updated in tables. but it is not getting updated. What is the reason.
How do I insert a file path?
What is the uses of ms word?
How do I change the default program for exe files in windows 10?
How many chart of accounts can company code have?
What processor architectures are supported by the cloud connector?
What is the difference between a restart and a graceful restart of a web server?
What dll file contains?
How long does windows 10 update take 2019?
What is the molecule responsible for the absorption of photic energy for photosynthesis?
How the stack is initialized?
What is a toxoid?
WHAT IS THE QUALITIES OF UCOBANK AND HOW POSITION IN INDIAN BANKING.