Draw SLD feeding from the SS up to distribution board of the load, calculate cable size, breaker sizes, and meter for the following case: Ground Floor: electric room, pump room, 5 shops, each is 15 KW First Floor: 5 shops, each is 15 KW Second Floor: showroom 30 KW Service Loads: water pump 3 KW (3ph) , fire pump 3 KW (3ph), and one DB service 12 KW (3ph).
2030Draw an S.L.D of the main panel for a hospital, showing meter position. Essential loads are: 1) Equipment load 100 KW 2) Critical load 500 KW 3) Life AID Safety load 400 KW 4) NON-Essential load 200 KW 5) Other service loads 200 KW Calculate and suggest the size of the transformer, size of main cable, capacitor bank, and calculate the capacity of an emergency load having above first three mentioned loads is supplied by an emergency generator.
2000Give accurate definitions for these electric terms: Inductor Inductance Inductive Induction Reactance Reactive Esam Baraka ٢١ ساعة
1399Post New HMK Interview Questions
Tell us what is a cpa?
Hi Viewers can any body explain me how to update and ahange the already existed data in physical file using subfile ? please explain me with the code if possible?
Why is iboutlet weak?
Can I concurrently access a firebird database with embedded and with regular server?
Give a brief explanation of the fundamental accounting concept of prudence
Explain the customer master record and list various segments in them.
Explain the architecture of firstlogic’s global data quality connector for sap systems?
What is javaserver faces expression language?
How long does it take to build a professional website?
What are the advantages of using rpa?
Where are maven dependencies stored?
Explain the execution cycle for a von neumann architecture.
how can u give space garentee for volume in netapp storage
What are the types of security in Blue Prism?
What is the pwd command?