Draw SLD feeding from the SS up to distribution board of the load, calculate cable size, breaker sizes, and meter for the following case: Ground Floor: electric room, pump room, 5 shops, each is 15 KW First Floor: 5 shops, each is 15 KW Second Floor: showroom 30 KW Service Loads: water pump 3 KW (3ph) , fire pump 3 KW (3ph), and one DB service 12 KW (3ph).
2010Draw an S.L.D of the main panel for a hospital, showing meter position. Essential loads are: 1) Equipment load 100 KW 2) Critical load 500 KW 3) Life AID Safety load 400 KW 4) NON-Essential load 200 KW 5) Other service loads 200 KW Calculate and suggest the size of the transformer, size of main cable, capacitor bank, and calculate the capacity of an emergency load having above first three mentioned loads is supplied by an emergency generator.
1987Give accurate definitions for these electric terms: Inductor Inductance Inductive Induction Reactance Reactive Esam Baraka ٢١ ساعة
1388Post New HMK Electrical Engineering Interview Questions
How to return query output in html format?
What are the skills required to be a bill collector?
What would be the value of month at the end of data step execution and how many observations would be there?
What is dynamic dispatch swift?
Does Pig support multi-line commands?
Does pandas recognize dates when importing data?
What are scoping commands?
What is ole? How do you handle drag and drop in ole?
Why use of template is better than a base class?
Define search head clustering?
What is like operator for and what are wild cards?
On what basis I will select or choose an uml modeling tool?
What is the purpose of xssfsheet class in apache poi?
Which rman command is used to create an exact replica of a database innew host?
Do we need to override service() method