Draw SLD feeding from the SS up to distribution board of the load, calculate cable size, breaker sizes, and meter for the following case: Ground Floor: electric room, pump room, 5 shops, each is 15 KW First Floor: 5 shops, each is 15 KW Second Floor: showroom 30 KW Service Loads: water pump 3 KW (3ph) , fire pump 3 KW (3ph), and one DB service 12 KW (3ph).
2077Draw an S.L.D of the main panel for a hospital, showing meter position. Essential loads are: 1) Equipment load 100 KW 2) Critical load 500 KW 3) Life AID Safety load 400 KW 4) NON-Essential load 200 KW 5) Other service loads 200 KW Calculate and suggest the size of the transformer, size of main cable, capacitor bank, and calculate the capacity of an emergency load having above first three mentioned loads is supplied by an emergency generator.
2043Give accurate definitions for these electric terms: Inductor Inductance Inductive Induction Reactance Reactive Esam Baraka ٢١ ساعة
1445Post New HMK Interview Questions
Do you have any idea how to compare array with pointer in c?
How to filter boolean field in soql?
Do you need system32 folder?
Mention few capabilities of sas framework.
Design a divide-by-3 sequential circuit with 50% duty circle now?
Pls send me some tickets and answerw purpose of interview?
Why do we use htaccess
Write a program to display a table of any given number?
Are applications using dojo mobile accessible?
What are the important differences between apache and hadoop?
what is the advantage of msil in c#
How much does a windows server license cost?
What is an example of a web based application?
What is the shortcut to hide in excel?
Enlist the priority of the testing tasks defined by the qa team in product development.