Answer Posted / joseph ravi kiran
THE IS CODE FOR M20 & M25 IS ...IS 456:2000.
THIS CODE GIVES THE PROCEDURE OF MIX DESIGN.
| Is This Answer Correct ? | 119 Yes | 26 No |
Post New Answer View All Answers
How much qty of stone ; sand; cement in R/R stone masonry of 136 CUM
how many tonnes equals to one cubic feet?
pls tell estimate for 1 kilometre length random rubble masonry 0.90 metre height 0.600 metre width
procedure for preliminary selection of size of column of 5 storey building
why the openings of sieves are square io size?
02. a. The diagonal of a 9 cube…………… 1 b. Surface area of 9 cube…………… 1 c. Volume of 1-3 cube …………… 1 d. Compressive area of 6 cube …………… 1 e. Top & Bottom face of a Cylinder/Cube is to be proper leveled to deliver the…………………………..…… properly.
If we are providing concrete joint in every 10m with water stopper in water tank wall then is it necessary to cut the steel at joint section?
i just want to know how much require sand and cement for 1 sq.mt including wastage. Please guide me as soon as possible.
I want to know about rolling margin of steel :- For eg. If 2nos. bundle of 8mm dia steel with17 rods each of length 12m comes to store. During testing of 1m rod of each bundle it was found that 1rod has weight .405kg/m while other has .385kg/m. Now what will happen in case of steel payment and measurement payment ? Regards,
Write short note on construction programme for pile foundation.
What is need for setting limits?
Gave a cantilever beam with 3 legs.Told to draw the bending moment diagrams, axial force diagrams and shear force diagrams.From BMD he asked to show how the reinforcement will be provided on the tension side.
explain five benefits of using standard terminology in the measurement process?
what is the function of GSB all class ?