why transmission line 11Kv OR 33KV,66Kv not in 10kv 20kv?
Answer Posted / ashish
it is because the form factor=1.11 so everything should be
multiple of 11.
| Is This Answer Correct ? | 83 Yes | 43 No |
Post New Answer View All Answers
what is 400kv doble circuit quadpole tower?
What is the gross weight to copper ratio in slip ring induction motor of 4000 HP,6.6 kv, 372amp, 992 rpm GE motor.
why swinburnes test cannot be performed on series machines?explain
where rlc series ckt used?
what is the purpose of bypass mode in energy lighting transformer?
what irequirment need to be followed when working on live equipment
list the type of vfd? wich is sutable for heating kiln?
In case of HV test on medium voltage cables, BS is asking for 4 U0 where as IEC is asking for 3.5 U0. Can any one advise me how this 3.5 times or 4 times U0 is derived?
(1)The demand for electricity , the amount of renewable generation available, the amount of fossil fuel generation available and the cost of the fossil fuel generation are shown in table below period(hrs) demand(MW) renewable (MW) fossil- fuel(MW) cost of fossil fuel(MW) 00.00 - 01.00 2000 1800 2000 30 01.00 - 02.00 2300 2500 2000 30 02.00 - 03.00 2500 2700 2100 45 03.00 - 04.00 2900 3100 2100 50 04.00 - 05.00 2700 2600 2500 45 05.00 - 06.00 2400 2000 2700 50 06.00 - 07.00 2200 1800 2000 36 07.00 - 08.00 2100 1600 2000 36 Assuming that the renewable generation incurs zero cost, determine an optimal generation schedule(specifying the amount of renewable generation and fossil fuel generation used in each period, the cost for each period and the overall cost for 8 hours.)
Practical condition in 400KV Sub station:- Breaker(open) , isolator(open), Earthing (close) at both end e.g A & B. Now Open A Stn Earthing than Open B stn Earthing (Which have a 50MVA reactor) , AND suddenly show R,Y,B phase 704KV,573KV,118KV respectively. Que is without closing of breaker how it is possible.???? My Whats app No:07621840498 for Further Discussion. Pls experts suggest.
Dears we deal in Chemical are Plate earthing. Kindly call if any requirement and questions. Tech Earth Solutions Mohit Verma 8791071007
How to calculat the ratio of HT\LT in energy meter
I have c license but I don't know eligibility of Max Kilo Volts under the electrical licensing board.
what will be project cost for 100 kv transformer connection under oyt scheme.
how to calculate