Answer Posted / s s
It is a Power System consisting Various Power Generating
Stations & Load Centres, which are interconnected to each
other.
Is This Answer Correct ? | 51 Yes | 13 No |
Post New Answer View All Answers
how to identify vector group of three phase transformer by voltage method?
hi , i have 150 kw loud and we need 50 m cabil,i want to know wich size cabil we use. thanks
If Neutral Grounding Resistor (GR) failed/shorted. Is it repairable.
difference bewteen reverse current and alternating current
Earth has zero potential then what would be the neutral potential ?
Which type of transformer is used for lighting loads?
Why field rheostat is kept in minimum position?
When calculating the speed of a rotor required for a particular frequency of synchronous generator we use the equation 60f/p Is this p is the number of pole pairs of rotor & do we consider the number of pole pairs in the stator is 1?
Dear All, I am new in construction company , my boss ask a question at time of interview , If we have 60MW generation and Single Power Transformer step-up we have. if CMR 50/60MVA , ONAN, ONAF respectively , is it sufficient or not ? for that much power to transfer,
what type questions asked in hp cl
what is PDU in transformer?? which company manufacture??
Describe the test procedure to determine the vector group
what is the purpose of shading ring or shading coil in electrical equipments.
why d.c produces corrosion
Dear all: Recently we got a question about Interface between PMS and SAP-PM.once we got a update message from PMS.we should set the deletional flag for functional location in SAP system.Is there any FM or BAPI to use?There are only functional location create and change provided by SAP. Best regards!