Caching, Multithreading and RAMBUS are 3 methods for resolving the Bottleneck problem. Please give an explanation for each one (how are they resolve the problem?)
from one meter cube of stone masonry structure how much cubic meter of cement mortar we use as our estimation 25-30% is that correct for estimation of quantity of sand and cement(2:1) proportion of mortar
i have a interlock pavement work.i need to compact about 2000 sq metres of sub base grade c of thickness 15 cm.what is the amount of water required for compaction ??
what is the specific gravity of rubble in plum concert
How do you calculate the power of a centrifugal pump?
What is the requirement for over all CG of DG from the foundation surface to absorb the vibration of heavy set.
IS code for grade of concrete for bamboo lintel????
what is the price of a cubic meter of concrete on international market?
Analyze the rate for 1st class brick work in superstructure with 1:6 cement sand mortar. Consider 1000 cu.ft quantity and work out the rate per cu.ft
How many types of slabs are there & how to design it?
what is the relation between pitch of steel and depth of slab?
During reclamation how can the occurrence of mud waves can be rectified?
how many spacers we need for 1 ton reinforcement? aprox.
Which are the top apps for you civil engineer?
What is the difference between EPC,DBOOT and BOOT.