Answer Posted / indranil mukherjee
Dcs is a automated contollable system which functionaly and
graphically distributed.
| Is This Answer Correct ? | 147 Yes | 26 No |
Post New Answer View All Answers
what are the documents(Construction point of view for a process plant) submitted by contactor initially entering in to new site for client?
A PLC is programmed to drive three motors A, B and C as follows : After running motor A for an hour, motor B should get ON and motor A should get OFF. And after running motor B for an hour, motor C should get ON and motor B should get OFF. And after running motor C for an hour, motor A should get ON and motor C should get OFF. (That is, a cyclic repetition with time period one hour) Now, the second condition is: If any motor gone faulty and is tripped, the consecutive motor should get ON and the faulty (tripped) motor should be eliminated from cyclic repetition. The remaining two motors should bear the cyclic repetition of one hour each. (For healthy motor take logic as high and for tripped motor take logic as low) Now, the third condition is: When motor A load(Amps) exceeds 60% of its rated load, motor B should get ON in parallel to motor A. And when both motors A & B are running in parallel, and if their load exceeds 60% of their rated load, motor C should also start in parallel to A & B. [Here the cyclic repetition is eliminated, until their loads become normal(40%)] [Take logic high(1) for load at 60% and logic low(0) for load at 40%] Now draw a flow chart or a ladder diagram to fulfill the above condition.
flow transmeter accuracy 0.075% of full scale & find ucertainty is 0.025 % so what is maximum limit band of uncertainty
what is difference between HOT permit and cold permit
A length of steel pipe is used to carry sea water to a desalination plant. An adequate corrosion allowance must be specified and indicated in the piping specification, which affects the _________________________ of the pipe
POSSITIVE PULSE IS APPLIED TO AN INVERTER INPUT.THE TIME FROM THE LEADING EDGE OF THE INPUT TO THE LEADING EDGE OF THE OUTPUT IS 10 ns. THE TIME FROM THE TRAILING EDGE OF THE INPUT TO THE TRYLING EDGE OF THE OUTPUT IS 8 ns. WHAT ARE THE VALUES OF tPLH and tPHL?
I have got a call of IOCL interview for projects having 2yrs experience. What sort of questions should I expect in the interview?
can anyone tel the syllabus or previous year question paper for BHAVINI(EIE)2014.
Type of level transmitter commnly used in Procees area are the following. a.________________This type of level transmitter works as follows
Can anybody please let me know Orifice plate sizing calculation formula and step by step procedure
what is the current pay package for an instrumentation engineer having 2 years of experience in cryogenic technology???????
How to interfacing microcontroller with a DC motor
How to erection of DCS Panel at site step by step
Area classification, Equipments, Gas groups, temperature classification, Ingress protection, Fire Extinguishers.
Why is it necessary to use compensation leg to measure the liquid level in a closed or pressurized tank?