Did you handle any interior designing jobs?




Answer Posted / j.antony mariadas

Having Sixteeen years of experience in
Architectural,interiors & Civil Engineering. I have reached
a level where I wish to consolidate upon my experience in
the above field. I have held a variety of positions
including Architectural Assistant, Project Engineer. which
have seen me to achieve excellent results.With more
emphasis on Site jobs, I have been a person in finalizing
and completion of various projects.I am looking for an even
more challenging and rewarding role where I can completely
devote the skills. I have acquired throughout my career.

I was in-charge for the following projects in CHENNAI-INDIA.

: M/s. Zylog Systems, - Office (G.F,I,II & III )
Civil, Architecture & Interior -
Siruseri, Chennai.
Cost of project – 1533 lakhs

: M/s. HCL ( BPO ) Technologies ( I & VI ),
Mini Campus – IT Park
Civil, Architecture & Interior -
Thooraipakkam, Chennai.
Cost of project – 592 lakhs.

: M/s. Cognizant Technologies Solutions ( G.F, I & IV )
Civil, Architecture & Interior – Sun Tech Park
Solinganallur, Chennai.
Cost of project – 880 lakhs

: M/s. Mehta Jewellery.
Civil, Architecture & Interior
Alwarpet, Chennai.
Cost of project – 145 lakhs

: M/s Lata Rampadran, Residential Bungalow
Civil & Interior Works.
Alwarpet, Chennai.
Cost of project – 24 lakhs

: M/s. Soma sekar, Residential Bungalow
Mylapore, Chennai..
Civil & Interior Work.
Cost of project – 30 Lakhs.

: Hotel Saravana Bavan,
Kenneth Lane, Egmore,
Civil, Architecture & Interior
Cost of project – 85 Lakhs.


: Hotel Saravana Bavan,
AshokNagar, . .
Civil, Architecture & Interior
Cost of project – 65 Lakhs
My response as follow as:

Site Execution, Tender Preparation
:
To co-ordinate with consultants.
:
Measurement Take off & Site inspection
:
Instructions to contractors.
:
Bill Checking & Certificate.
:
Quality control of Materials & Workmanship

Is This Answer Correct ?    1 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Which are the top apps for you civil engineering?

686


what is relation between SPT N value and driving piles after conducting a soil test?

1589


In foundation design, while we do the base pressure check, we normally check if the attained pressure value is less than the GROSS BEARING CAPACITY of the soil which is the sum of net bearing capacity of soil and the overburden pressure. Actually, the overburden pressure acts against the net bearing capacity of the soil and I feel that we are actually increasing the bearing capacity value and doing the check. I feel that this is NOT right. Please clarify on this.

1816


How to calculate concret slab? W l t(4mts*5*2fts) ratio m25 grade pls tell me procedure

1776


Gave a cantilever beam with 3 legs.Told to draw the bending moment diagrams, axial force diagrams and shear force diagrams.From BMD he asked to show how the reinforcement will be provided on the tension side.

2512






what is the formula for Mass of cement grout (Dg)=???

1740


Write short note on construction programme for pile foundation.

4974


How its coming concrete grade M 20 means 1:2:4. how it coming 1:2:4.

1010


what is the basic difference between Coloumn & Shear Wall

1692


What is costing in 100squre feet bricks

1416


How much quantity of cement and sand required for the inlining of 610mm dia MS pipe 8.7mm thk.Inlining thickness is 10mm and CM ratio is 1:1.5.

3710


explain what do you mean by the property development.

1633


How much cement and sand are required for 1 square feet of plaster at a thickness of 15 mm at a ratio of 1:4?

1198


The mixture of different ingredients of cement is burnt at?

1107


What is Heavy Concrete & Normal Concrete

2237