how can calculate material in 1:1.5:3 ratio in concrete
Answer Posted / madhusudhan
for 1 m³ concrete (M20=1:1.5:3)the material required is
(1+1.5+3)=5.5
1/5.5=0.1818*1440=261kg cement or 5.32 bags
1.5/5.5=0.272 m³ Fine aggregate
3/5.5=0.545 m³ Coarse Aggregate
Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
Which are the top apps for you civil engineering?
What is the frequency of sampling for the materials of cement,Fine aggregate, Coarse aggregate .and refer which code
In an aggregate blending plant, water is sprayed before blending is performed. If the fine content in aggregate is as high as 25 %, will not the fines form into lumps / balls and distribution will not be uniform ? Further, the fines will stick onto the interior of pug mill and its content will be low. The mixed material is stockpiled for weeks / months before use. Will it not be better that blending is done in dry condition, and water will be added only during compaction at site. Please forward your comments and suggestions.
if size is 235cmsx15cmx100cms so how many cement bags and how many sand bags are used for concrete mix
Types of column foundation and how to calculate its steel quantity.
What are the responsibilities of a construction manager?
why the profile of shell of natural draught cooling tower is hyperabolic.
how much quantity of 1.5" nails and 2.5" nails are required for conventional formwork shuttering?
Describe the advantages and disadvantages of using plastic and timber fenders?
I need model question papers for writing the Dubai municipality exam,for G+1
Define Workability ?
sir tell me the formula for calculating the volume of 380mm dia double under reamed pile of 4.0 mts depth.
I want to know how much the lapping length for the pilecap reinforcement.. we r using single pile cap which is 24mby54m and 2.5m depth.. total 91piles are supporting the pile cap.. how to do a steel reinforcement??
For a washout valve why are two gate valves required in normal practice?
What is the quantity of cement used for stone pitching work of 100sqm 225mm thick and cement mortar of 1:6? And how?