how much quantity of blocks, cement and sand is required to
complete 1sq.m of CC Hollow blockwork. Size-16"x8"x8". Also
what is the cement sand ration commonly used?

Answer Posted / betonaloka

Do you want to see the consumption of cement in each building block on the beton aloka site?

Is This Answer Correct ?    0 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

mix design procedure for 1:6 cement mortar

1732


will fix foundation bolts at site with out template is there any procedure?

2153


wat would be the probable interview questions and GD topics for IOCL exam?

9227


Define What are the uses of alloys in daily life and how are alloys made?

728


what is mc arther pile?

1771






what is the construction cost for per cft of multistorryed building in kolkata?

1778


why is M25 and Fe 500 assumed to be most economical? i feel it is not.This is because higher grade of concrete and steel has higher lapping length and anchorage length compared to lower grades..

2079


How to calculate concret slab? W l t(4mts*5*2fts) ratio m25 grade pls tell me procedure

1764


WHAT WII BE THE WATER ABSORPTION POWER OF WOOD ?

1779


how much cement and sand consuptin in 4 inch siporex walls 100 sq ft

2497


Kindly post me previous year interview questions with answer for post of Manager (civil engg.) for NTPC, IOC , GAIL etc. I have interview on july 2013.I will be very grateful to you. Please guide me.

1786


Difference between pre-tensioning and post-tensioning.

680


How much for the BRC lapping in full yield and half yield < and which table to get it ?

2026


explain the advantages of total stasion

1677


How to calculate ventonite bag in pile ( pile depth 25 m dia 1m)

1290