Answer Posted / shahul
7850
| Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
what is the max. and mim. height of vertical post in informatry sign board which is used in highway projects.
while doing the structural works of a simple ground+1 villa, can the columns be continued immediately after neck columns without tie beam, while the tie beam to be done after columns concreting.
If we don't have drawing for Excavation of building,At what rule we will go for excavation and how much depth will go for a villa?
what happening if we casting HV shunt reactor foundation pad at 50cm height different time (One day difference)
What are the different types of foundation?
How to find permissible diagonal tensile stress in reinforced brick work
The concrete slump recommended for beams and slabs; is?
what is the difference between prime coat and tack coat in road construction
1:4:8 pcc calculation 591 cu.ft
IS code for Rolling Margin of steel
i have to give lap joint fo 1Mtr steel of dia12mm,whenever i did mistake i cut less 5cm plz tell me how much i will give lap joint so that length comes 1Mtr
Why are steel plates inserted inside bearings in elastomeric bearing?
Define What is the distance between railway tracks?
how water proof chemicals act in concrete to avoid leek?
Define What glue is least sticky?