What factors should be compared when evaluating cooling tower bids?

Answer Posted / 7207502748

Evaluating cooling tower bids should be compared following Factors-

* Fan energy consumption

* Pump energy consumption

* Purchased cost

* Installed cost

* Water treatment costs

* maintenance costs

* safety measurements

* Environmental conditions

Is This Answer Correct ?    0 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

How can you separate hydrogen peroxide into hydrogen and oxygen?

649


How much water is lost through a commercial cooling tower system with a throughput of about 600 gpm?

634


What are the strategies acquired to cure tube vibration and exchangers in a shell?

738


What is higher heating value and lower heating value? Is it positive or negative?

2534


What are some good estimates for heat transfer coefficients for coils in tanks?

1835






what is the purpose of capacitor? and capacitor load means what? how does it connect?

1953


While there, are many tests available to detect leaks on vessels, is there a technology available to quantify the leak, or measure the flow through a leak?

704


What is a good relation to use for calculating tube bundle diameter?

557


hi all i have doe cheical engg, but i have to go for iob po interview so can anybody suggest me abt the kind of qns that can be asked.

1726


Do you have any idea on recombinant protein expression?

604


which materials can l use if l want to use length wave 680 to 900 in hplc

1575


What is a good method of analyzing powders for composition?

674


could anyone send me model question papers or outline of graduate trainee(chemical engg) post?

2853


How is plate heat exchangers used in an ammonia refrigeration system?

655


What particle sizes are electrostatic precipitators used to remove?

599