Evaluating cooling tower bids should be compared following Factors-
* Fan energy consumption
* Pump energy consumption
* Purchased cost
* Installed cost
* Water treatment costs
* maintenance costs
* safety measurements
* Environmental conditions
Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
How can you separate hydrogen peroxide into hydrogen and oxygen?
How much water is lost through a commercial cooling tower system with a throughput of about 600 gpm?
What are the strategies acquired to cure tube vibration and exchangers in a shell?
What is higher heating value and lower heating value? Is it positive or negative?
What are some good estimates for heat transfer coefficients for coils in tanks?
what is the purpose of capacitor? and capacitor load means what? how does it connect?
While there, are many tests available to detect leaks on vessels, is there a technology available to quantify the leak, or measure the flow through a leak?
What is a good relation to use for calculating tube bundle diameter?
hi all i have doe cheical engg, but i have to go for iob po interview so can anybody suggest me abt the kind of qns that can be asked.
Do you have any idea on recombinant protein expression?
which materials can l use if l want to use length wave 680 to 900 in hplc
What is a good method of analyzing powders for composition?
could anyone send me model question papers or outline of graduate trainee(chemical engg) post?
How is plate heat exchangers used in an ammonia refrigeration system?
What particle sizes are electrostatic precipitators used to remove?