Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

what is water consumption rate of water to condense one ton steam in condensor.

Answer Posted / powerplant.calculations

As a rule of thumb Around 65 MT of cooling water is required to condense the steam at rated vacuum.

Refer below link for more information
https://www.powerplantandcalculations.com/2020/05/steam-condenservacuum-and-calculations.html

Is This Answer Correct ?    0 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

can u please tell me how to calculate the concrete quantity for a under reamed pile? r=300mm,depth=3m for a cylinder and for bulb l=.750mm,width=.525

1763


what is natural frequency of turbine shaft .

2328


What is difference between secondary Air & Tertiary Air and Their use.?

2019


dear sir i have completed one year post diploma certificate in thermal power engineering from national power training institute durgapur ...plz suggest me for power sector job

2564


Which will have more strain energy 1.Spring 2.Circular disc 3.Solid square plate.

2427


what's the moog valve

1525


what does mean by kva rating

1532


Looking for Bently Nevada surplus 3300/52-01-00-00 Reverse Rotation Monitor , 4 pieces.

3425


our 125 kva DG does not start in AUTO mode works normally in MANUAL mode please give me a solution.....

1724


some one can tell me how residual type excitation is provided through transformers to an AC generator without any battery or PMG&excitor

2446


why is the in steam turbine axial displacement of active side thrust pad is positive and non active side thrust pad is negative.

3274


What is LB-SR.

3028


procedure of how to generate power in solar plant.

1969


what is restricted earth fault explain in details

2067


Qatar Fertiliser Company (QAFCO) Shortlisted me for interview (got the intel from my source) for Field Operator- Utilities post. Please let me know what kind of questions they asked? ... this position requires 5 years of experience in Power Plant and background Diploma in Electrical/ Mech. ... my Background is Electrical and I am a sub Assistant Engineer (Operation) at a private HFO based Power plant... PS: Please Let me know what preparation should I take to obtain the Interview which will be take place In Bangladesh soon

2509